Road: 2009 Year End Report |
 |
During 2009, the Road crew completed 3,650 work order requests for services such as patching, street sweeping, catch basin repairs, curb repairs, drainage, vactoring, roadside mowing, snowplowing, and deicing of township roads.
The Road Department also completed the following work:
|
 |
|
2009 Road Paving
|
|
Paved 11.57 miles of road
|
|
Paved and power boxed township roads using 399 tons of asphalt
|
 |
|
2009 Curb & Gutter Replacement
|
|
Replaced/repaired a total of 2,512 feet of concrete curb and gutter
|
|
Installed or repaired a total of 4,209 feet of asphalt curb
|
 |
|
2009 Culvert Replacement
|
|
Installed, replaced, or repaired 3,875 feet of culvert pipe
|
|
Reconstructed 440 feet of roadside ditches
|
 |
|
2009 Pavement Marking
|
|
Striped 24.3 miles of center line
|
|
Striped 40.93 miles of edge line
|
 |
|
2009 Crack Sealing
|
|
Crack sealed a total of 4.63 miles of roadway
|
 |
|
2009 Vactor & Street Sweeping
|
|
Vactored 74,567 ft. ditch line
|
|
Flushed/cleaned 14,741 ft. pipe
|
|
Cleaned 165 catch basins
|
|
Swept 680 curb miles of road
|
 |